Maintenance of shotcrete machine
1 Daily care and maintenance
1.1 At the end of each job, the host must provide for flushing 4.1.3.
1.2 After stopping to check the power, gas supply, must confirm all been cut.
2 Regular care and maintenance
2.1 Each drive chain should infusion once every week lubricant should be cleaned once a month.
2.2 Reducer should be checked every three months refilling 46 # machine oil once.
2.3 Each week you should check the tightness of the transmission chain, check the tightness of the screws and secure clutch sprocket fixing screws.
2.4 Three-way valve clearance pilot chute should always check with the skateboard, badly worn should be replaced.
2.5 Fittings seals can only be used once, changed every six months, without disassembly. Hydraulic system memory tank once a month to check the oil, the oil should be enough to raise the amount of 32 # hydraulic oil or machine oil.
2.6 The host after the expiration of one year each use, all parts should be cleaned once all the demolition of badly worn parts should be replaced.