8 kinds of in the common form of retaining and protection of foundation pit analyzes with the advantage and disadvantages

2019-11-25 09:12:40

 

The purpose and effect of retaining and protection of foundation pit 
 
1. Ensure the stability of the soil around the pit, at the same time there is enough space to 

 meet the basement construction requirements, this is a necessary condition for earth 

 excavation and construction of the basement.

2. Guarantee pit surrounded by adjacent  buildings and underground pipelines and other 
facilities in the basement during the retaining and protection of foundation pit and 
construction will not be harmed, that pit soil deformationincluding vertical and horizontal 
displace
ment of surface and subsurface soil to be controlled within the allowable range.

3. Through cut the water, rainfall, drainage and other measures, ensure that foundation pit

engineering construction work surface above the underground water level.

The type of foundation pit supporting structure and its applicable conditions

1. Grading excavation
Advantage : Only requires stable, the price is the cheapest.
Disadvantage: Backfill earthwork is larger.
Application: The space is wide, no major building projects around.


   

1. Enclosure wall deep mixing cement soil

Deep mixing cement-soil enclosure wall is to use deep mixer in situ soil and the input of the

slurry  forced mixing. Forming a continuous overlapping soil cement pillar plus solid retaining
wall.
Advantage: 
1. Due to the general pit without support;
2. F
acilitate rapid mechanization excavato-
rs;
3. Has retaining soil, waterproof the dual function;
4. Under normal circumstances the more ec
onomical;
5. Construction no vibration;
6. No noise, less pollution, soil compaction mild.

Disadvantage:
1. Relatively large displacement thickness;
2. For the length of the large foundation 
pit, take the middle pier and arch camber to limit 
excessive displacement;
3. Construction should 
pay attention to prevent affecting the surrounding environment.

Application: Downtown project




3.
 High pressure jet grouting pile

High pressure jet grouting pile materials are also used in grout, it is through the use of high 
pressure rotating nozzles grout is injected into the soil and the soil mix to form a soil cement

plus solid, overlap each other to form a row of piles for retaining soil and waterproof.

Advantage: Construction equipment compact structure, small volume, strong 
maneuverabil
ity, covers an area of less, and small construction equipment vibration, noise is 
also lower, 
without  bring vibration and noise of the surrounding buildings, etc.

Disadvantage:  The construction of a large number of sludge discharge, easy to cause 
poll
ution. For groundwater flow rate is too large stratigraphic, nfiller in karst area of 
permafrost 
and the severe corrosion of cement soil, because of the jet grout can't around 
the 
grouting 
pipe solidification, unfavorable use this method.

Application: The smaller space construction project.




4.
 Channel steel sheet pile

This is a simple steel sheet pile enclosure wall, by channel compos ed of positive and 
nega
tive side buckle or lapChannel steel length 6 ~ 8m, the model is determined by 
calculation.

Advantage: 
1. Good durability;
2. The second high utilization; 
3. Easy construction, short construction 
period.

Disadvantage: 
1. Can't block the tiny particles in water and soil, resisting or precipitation mea
sures to be
taken in areas of high groundwater levels;
 
2. Flexural capacity is weak;
3. Supporting 
small rigidity, large deformation after excavation.

Application: Used for shallower depth ≤4m pit or trench.




 5. Bored pile

Bored pile with high load capacity, settlement and other small features.

The construction of  bored piles, because the formation of different selected wall. There
are t
wo ways slurry wall constru
ction law act and a full pipe.

Advantage :  
1. No construction vibration, noise and other environmental hazards, no soil
compaction 
phenomenon, little impact on the surrounding environment; 
2. Wall 
body is high 
strength, stiffness big, support good stability and deformation of small; 
3. When the engine
ering pile for filling pile construction, you can synchronize the 
construction, 
which is conducive to the construction organization construction, short 
construction period.

Disadvantage:
The gap between piles easily cause soil erosion, especially in high water 
areas of soft clay.
Need 
to be  taken in  accordance with the  conditions  grouting works, cement mixing pile, 
jet grouting pile other construction measures to address the problem of retaining water.
Application: Its the one of the most widely application in row pile,Usually for 7 ~ 15m deep 
foundation pit engineering
, suitable for soft clay and sandy soil area.




6. Diaphragm Wall

Advantage : Stiffness is big, waterproof effect is good, is the strongest support form in 
supporting structure.
Disadvantage: Higher cost, construction require used special equipment.
Application: Poor and complicated geological conditions, foundation pit is deep, the 
foundation pit is high demand with environment surrounding.




7.
 Soil nail wall

Soil nail wall slope stability is a type of supportIts role and passive soil retaining effect of 
the enclosure 
wall is different, it is embedded solid active role, increase the stability of the
slope,
so that after excavationslope stability.
Advantage: Stable and reliable, easy construction and short time limit, the effect is good, 
economy good, in good soil region should be actively promoted.
Disadvantage: Poor soil areas is difficult to use.
Application: The main application is the better soil area.




8. The SMW method

SMW method, also known as strength of the cement mixing pile, in inserting h-beam in 

cement-soil pile, etc. (most for h-beam, insert the also have tensile steel sheet pile, steel

pipe, etc.), will bear the load and seepage retaining combine, making enclosure wall also
has support force structure and permeability of the two functions. 

Advantage : 
1. Almost no noise during construction, little impact on the surrounding enviro
nment; 
2. Reliable structural strength, any application for cement mixing pile occasions can be 
used;
3. Retaining seepage good performance, do not separate retaining curtain; 
4. Can be 
used with multi-channel support is applied to the deep pit; 
This construction method under certain conditions can replace underground continuous wall 
as 
underground enclosure wall. If the cost of construction can take certain measures, such 
as the successful recovery
 of H-shaped steel tensile material is much lower than the 
diaphragm wall, and thus have 
greater prospects for development.
Application: Can be applied in clayey soil, silt, sand, gravel, soil, etc.
We can supply retaining and protection of foundation pit equipment, gout equipment, shotcrete equipment, concrete equipment, foam concrete equipment, peristaltic hose pump equipmnet, etc. construction equipment, any need, you can tell me freely. Email address: info@gaodetec.com.


Inquiry >>
info@gaodetec.com86-371-55951660
Products you need :
Your name :
Your tel :
* Your mail :
Your company :
Your country :
* Inquiry :
PRODUCT CATEGORIES