Concrete Pump application in Pipeline Layout should be based on the characteristics of the construction site and concrete pouring program to pipe. Piping design to check whether the horizontal conversion distance of the pipeline is compatible with the pumping distance of the concrete pump. Piping should be as short as possible to reduce the length of the pipeline, less with elbow and hose. The laying of the delivery pipe should facilitate piping cleaning, troubleshooting and disassembly and maintenance. When the new tube and the old pipe mixed, the new pipe should be arranged in the pumping pressure. Piping should be drawn during the piping process, listing the specifications and quantities of various fittings, pipe cards, elbows and hoses, and provide a list.
When the electric drive concrete pump needs to be piped up vertically, the height of the concrete increases with the increase of the potential energy, and there is a tendency for the concrete to return. Therefore, a certain length of the horizontal pipe should be laid between the concrete pump and the vertical pipe to ensure that there is sufficient resistance to prevent the concrete Backflow. When pumping high-rise building concrete to be vertical upward piping, this time the horizontal pipe length should not be less than the vertical tube length of 1/4. If the site is limited, can not place the required length of the water pipe, the use of elbow or hose instead. Hope that we offer concrete pump pipe arrangement techniques that can help you. If you need more pipe routing information, please contact us.